This is default featured slide 1 title
Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.
This is default featured slide 2 title
Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.
This is default featured slide 3 title
Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.
This is default featured slide 4 title
Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.
This is default featured slide 5 title
Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.
Selasa, 31 Disember 2013
Isnin, 30 Disember 2013
HEBAHAN KURSUS : TATACARA PEROLEHAN SEBUT HARGA
Khamis, 12 Disember 2013
Khamis, 5 Disember 2013
INFO BUKU: ALAM JURUTERA
Title : Alam Jurutera
Author : Abdul. Rahim Abdul Manaf
ISBN : 983-100-075-7
Year Publish : 2000
Page Number : 652
Harga : RM 35.00
|
SINOPSIS
BUKU Alam Jurutera ini merupakan gabungan bahan-bahan class-tested dan maklumat yang relevan kepada jurutera. Kandungannya telah diperbaharui menurut fakta-fakta industri tempatan. Ia merupakan suatu percubaan untuk menggabungkan fakta-fakta yang mencerminkan kedudukan industri daripada perspektif jurutera. Hanya industri-industri yang khusus sahaja dipetik.
Kedudukan industri elektronik di Malaysia umpamanya, tidak disentuh melainkan secara sepintas lalu kerana hal ini akan melibatkan terlalu banyak perbincangan. Seperti buku-buku yang mendahului Alam Jurutera, imbangan tajuk-tajuk khusus adalah berdasarkan keperluan berikut: (a) mengadakan bahan rujukan yang padat bagi jurutera; (b) menyediakan teks yang komprehensif untuk mahasiswa kejuruteraan; (c) memberi bahan yang mudah dibaca oleh bukan jurutera supaya golongan ini dapat menghayati pandangan para jurutera.
Rabu, 4 Disember 2013
Selasa, 3 Disember 2013
Khamis, 28 November 2013
Selasa, 26 November 2013
KURSUS PENCUCIAN BANGUNAN DI PENANG (11 JANUARI 2014)
Kursus Kaedah Mencuci, Membersih dan Menyelia Bagi Kontrak Mencuci Bangunan dan Membersih Kawasan
pada 11 JANUARI 2014 (Sabtu).
SILA HUBUNGI 012 387 5655 (AZILAN ) atau
email chee_lin@yahoo.com
UNTUK KETERANGAN LANJUT
Ahad, 24 November 2013
Contoh Bar Bending Schedule
Isnin, 18 November 2013
Bored Piling
Selasa, 12 November 2013
Sabtu, 9 November 2013
Info Buku: Teori Dan Amalan Penilaian Harta Tanah
Sekiranya berminat untuk memiliki buku ini.Sila email kepada chee_lin@yahoo.com atau wassup 012 387 5655
Khamis, 7 November 2013
Isnin, 4 November 2013
STRUKTUR KONKRIT YANG BIASA TERDAPAT DI TAPAK BINA
Punca Kelewatan Penyediaan Penutupan Akaun Untuk Kontrak Kerja
- Kelewatan penilaian kos muktamad perubahan kerja dan kelulusan Pelarasan Harga Kontrak
- Kontraktor/ perunding lewat mengemukakan dokumen sokongan yang lengkap dan terpeinci
- Tempoh mencapai persetujuan antara kontraktor dan Pegawai Penguasa/ Pengarah Projek (P.P) terhadap kadar harga, kuantiti, speksifikasi dan sebagainya yang agak panjang.
- Kelemahan P.P dalam melaksanakan tanggungjawabnya.
Rabu, 30 Oktober 2013
Harga-harga bahan 2013
Sekadar untuk rujukan dalam membuat anggaran.
Kredit kepada : http://industribinaan.blogspot.com/
Kerja-kerja konkrit - update 2013
- Simen (1 bag 50 kg) - RM 17.00/kg -
- Bata simen - RM0.23 satu
- Bata merah - RM0.35 satu (tak pakai utk rumah ini -utk info)
- Pasir kasar - RM 50 satu ela
- Pasir halus - RM 55 satu ela
- Batu aggregate 3/4" - RM 55 satu ela
- Besi Y 10mm (40 kaki) - RM 18 sekaki - RM2500 /ton
- Besi Y 12mm (40 kaki) - RM 24 sekaki
- Besi R 6mm (40 kaki) - RM 6.50 sekaki
- Besi BRC A65 - RM 15.90 satu gulung
- Tiang konkrit saip bancuh(4"X4"x12') - RM 3.30 sekaki
- Tiang Roman 9' - RM 10 sekaki (tak pakai utk rumah ini -utk info)
- Dawai bata - RM 6.80 satu gulung
- Dawai ikat besi - RM 15 satu gulung
- Bata bunga lubang angin - RM 2 satu
- U drain (tanah liat) - RM 4.10 sekeping
- Plywood(4'X8'X12") - RM 44- 76 sekeping
- Kayu 2"X1"X8' - RM 9.90 satu
- Kayu 2"X1"X10' - RM 11.00 satu
- Kayu 2"X3"X8' - RM 14.71 satu
- Kayu 2"X3"X10' - RM 19.06 satu
- Kayu 2"X3"X12' - RM 26.44 satu
- Kayu 4"X4" - RM13 sekaki
- Kayu 2"X5" - RM3.50 sekaki
- Paku 2 " - RM 4.96 /kg
- Main truss besi 3"X1.5"(kekuda) (20 kaki) - RM 23 sebatang
- Purlin truss besi bumbung (20 kaki) - RM 13.50 sebatang
- Roof corrugated metal sheet (lebar 2.5 kaki) - RM 3.30-4.30 sekaki panjang
- Rabung atap (8.5 kaki) - RM 26 sekeping
- Zink licin (lurah atap laluan air hujan) - RM 3.60 sekaki
- Skru atap - RM 35 sekotak
- L bracket - RM 1.50 satu
- Papan facial board (12 kaki) - RM 22 sekeping
- Mesin Grinder pemotong besi - RM 190
- Gentool Cutter pemotong besi - RM 160
- Disc cutter - RM 2 satu
- Wheel barrow - RM 70 satu
- Frame pintu besi 34"- RM 55 satu
- Frame pintu besi 54" - RM 65 satu
- Pintu Panel kayu 34"- RM 175 satu
- Pintu Panel kayu 54"- RM 360 satu
- Pintu bilik air (model baru jenis sliding) -RM 380 satu
- Tanah merah - RM 25 satu ela
- Tangki septik - RM 920 satu
Jumaat, 25 Oktober 2013
Rabu, 23 Oktober 2013
Jumaat, 11 Oktober 2013
Khamis, 10 Oktober 2013
Rabu, 9 Oktober 2013
LAMAN WEB YANG PERLU DISINGGAH - http://jualbukuteknikal.blogspot.com/
Selasa, 8 Oktober 2013
Info Buku~Pengurusan Pembinaan (Konsep,Strategi dan Aplikasi)
Ahad, 6 Oktober 2013
Peperiksaan Final Exam / Direct Final Exam oleh Pertubuhan Juruukur Diraja Malaysia (RISM)
Sebanyak 7 paper exam untuk Final Exam atau 10 paper exam untuk Direct Final Exam perlu diambil oleh calon untuk melayakkan mereka mendaftar sebagai Graduate Members bersama RISM.
Silibus untuk Final Exam adalah seperti berikut:
Bil
|
Subjek
|
Jam Peperiksaan
|
1.
|
Measurement 3 (2 paper)
|
6
|
2
|
Construction Technology 3 ( 2 paper)
|
6
|
3.
|
Project Management
|
2
|
4
|
Development Economics
|
3
|
5
|
Cost Value Engineering
|
3
|
6
|
Construction Law
|
3
|
7
|
Professional Practice 2
|
3
|
Manakala Silibus untuk Direct Final Exam adalah seperti berikut:
Bil
|
Subjek
|
Jam Peperiksaan
|
1.
|
Measurement 2 (2 paper)
|
6
|
2
|
Measurement 3 (2 paper)
|
6
|
3.
|
Construction Technology 3 ( 2 paper)
|
6
|
4
|
Project Management
|
2
|
5
|
Development Economics
|
3
|
6
|
Cost Value Engineering
|
3
|
7
|
Construction Law
|
3
|
8
|
Professional Practice 2
|
3
|
9
|
Law – Contract & Tort
|
3
|
10
|
Building Economics
|
3
|
Terdapat beberapa buku yang boleh dijadikan panduan kepada calon yang mengambil peperiksaan yang seperti berikut:
1. Subjek Measurement 2 - Buku Pengukuran Kuantiti Bangunan (Edisi ke 2) & Buku Anggaran Kos kerja Bangunan (Edisi 2)
2. Subjek Measurement 3 - Buku Measurement of Civil Engineering Works Based On Malaysia CESMM & Buku Anggaran Kos kerja Bangunan (Edisi 2)
3. Subjek Building Economics & Subjek Development Economics- Buku Ekonomi Bangunan & Buku Construcion Economics
4. Subjek Law & Subjek Construction Law - Buku Undang-Undang Tort Dalam Industri Binaan Di Malaysia & Buku Undang-Undang Tort Dalam Projek Pembinaan
5. Subjek Profesional Praktis 2 - Buku Pengurusan Kontrak (Arahan Perubahan, Bayaran Interim dan Akaun Akhir)
SEKIRANYA MEMERLUKAN BUKU RUJUKAN TERSEBUT , BOLEH WASSUP SAYA
012 3875655
Sabtu, 5 Oktober 2013
Carta Top 3 Buku Teknikal 2013 blog borak-qs
Top 1~ Anggaran Kos Kerja Bangunan
Top 2~ Pengukuran Kuantiti Bangunan
Top 3~ Pengurusan Projek Pembinaan
Sabtu, 28 September 2013
Info Buku
Author: Mohd Fadzil Daud Publisher: Penerbit UTM Press • 2005 • ISBN 983-52-0381-4 • 156 pages • Edition 2 |
Rabu, 25 September 2013
Sabtu, 21 September 2013
Rabu, 18 September 2013
Isnin, 16 September 2013
Buku Pengukuran Kuantiti Bangunan & Anggaran Kos Bangunan